Medical Office200,000 sq ft
Medical Office BAS Upgrade: 200,000 sq ft
Full controls retrofit of a 200,000 sq ft medical office building from proprietary DDC to Niagara N4 with BACnet integration. 32% energy reduction in year one.
32%
Energy Reduction
2.8 years
Payback Period
$182,400
Annual Savings
Commercial Office145,000 sq ft
Proprietary-to-Niagara Migration: Commercial Office
Incremental migration from a locked-in proprietary BAS to open Niagara N4 platform. No downtime, no rip-and-replace.
60%
Service Cost Reduction
99.8%
System Uptime
Single source
Vendors Eliminated
Industrial / Manufacturing310,000 sq ft
Industrial Facility Energy Optimization
Chiller plant and air handling optimization for an industrial facility. Submetering, demand response, and automated sequencing delivered 38% HVAC energy reduction.
38%
HVAC Energy Reduction
$247,000
Annual Savings
210 kW
Peak Demand Reduction